Unlike some other builders, the front and garage doors are just temporary ones and not the actual doors. I think this is better as these doors will be used and abused over the next few weeks. All the doors are sitting in the study - all 30 of them. The timber for the shelving and window sills are sitting in the living room.
Thursday, November 19, 2009
LOCKUP!!!
The house is now locked up!! Another milestone however this one comes with a hefty progress payment.
Unlike some other builders, the front and garage doors are just temporary ones and not the actual doors. I think this is better as these doors will be used and abused over the next few weeks. All the doors are sitting in the study - all 30 of them. The timber for the shelving and window sills are sitting in the living room.

Unlike some other builders, the front and garage doors are just temporary ones and not the actual doors. I think this is better as these doors will be used and abused over the next few weeks. All the doors are sitting in the study - all 30 of them. The timber for the shelving and window sills are sitting in the living room.
Bricks cleaned
Didn't see anything done today until I looked closely....the bricks have been cleaned. The proper acid clean and don't the bricks come up nice! Although we have now noticed that the window sill for the bathroom has a big chunk missing! :( Must add this to the inspection list of defects.
Wednesday, November 18, 2009
Tuesday, November 17, 2009
Plaster Set - Day 4 / Garage Grano Done
More plastering done today. They expect to only do a half day tomorrow to finish which is likely as they have the kitchen and home theatre to complete. Oh also the back wall of the linen which they will have left until last for some reason. I have noticed that they have missed the data point in the study which they have plastered over.
Other news is that the grano was poured in the garage today. Tried to get there to imprint our hands but that stuff dries quick!

Other news is that the grano was poured in the garage today. Tried to get there to imprint our hands but that stuff dries quick!
Monday, November 16, 2009
Plaster Set - Day 3
More great work today by the plasterer's (and more beer!). The ensuite, bed 1, study and partial entry was completed today. So now it looks more likely that they will finish on Wednesday and not Tuesday as they forecasted.
Someone has dumped lawn clippings in our rubbish pile today. Not sure if it was neighbours or one of the contractors. Not major but not expected.
Good news is that they have prepared the garage pad for the slab. Not sure if they will pour it this week but looks like it can't be long as they have pegged it and bunded it so that people can not enter!

Someone has dumped lawn clippings in our rubbish pile today. Not sure if it was neighbours or one of the contractors. Not major but not expected.
Good news is that they have prepared the garage pad for the slab. Not sure if they will pour it this week but looks like it can't be long as they have pegged it and bunded it so that people can not enter!
Saturday, November 14, 2009
Plaster Set - Day 2
A lot of work done on Friday - they even did a full day rather than sto pat 3pm. So now bed 2, bed3 and the hallway are complete. They have missed (forgotten?) to do the inside wall of the linen cupboard. Will need to check that before they finish on Tuesday. Oh and they have also cleaned out all the switch/powerpoint boxes. They did a really neat job of pulling out the wires and trimming the box!

Thursday, November 12, 2009
Plaster Set - Day 1
They have now started on the plaster set. It is the same guys that did the plaster render - just the three of them. So on day 1 they have done quite a bit - bed 4, bed 5, laundry, WIL, bathroom and some of the powder and linen.
And on the outside, they have done site clean #3.
And on the outside, they have done site clean #3.