Wednesday, September 23, 2009

Roof Timber Day 2

The carpenters were back this morning with backup from a couple of mobile cranes. Not sure exactly why they needed two cranes but they lifted all the steel up and also some of the longer/bigger timber. Still a lot of timber on the ground!
Second longer reach crane
Other crane was a Franna
Garage timbered
Games room timber and steel
Not sure about the support for the steel beam
Hallway with timbersTimbers still to be installed