Friday, November 6, 2009

Ceiling Day 3 - Flushed

OK so day 3 and all the ceilings have been flushed along with the bulkheads. All the cornices have been measured and cut and the offcuts (there is a lot of them is in the wast heap).




Manhole

No comments:

Post a Comment