OK so day 3 and all the ceilings have been flushed along with the bulkheads. All the cornices have been measured and cut and the offcuts (there is a lot of them is in the wast heap).
After getting ridiculous quotes to add 2 bedrooms and a bathroom, we will have decided to demolish and rebuild on our existing block. This is due to an unexpected surprise which we are expecting in September. So 4 kids under 5 in a 3 bedroom house just does not keep the peace. We are building NOR in Perth.
No comments:
Post a Comment