It has been a while but life has been hectic after coming back from China. The builder is still working and hoefully some work will be done over the shutdown period. However a lot has happened in the last week. Mostly it has been tiling but the plumber looks like he has come also. The painter has been and gone.
Tiling: ensuite is finished (except grout), ensuite toilet walls to be done, bathroom is finished (grouting done on walls), laundry is done, powder is done, kitchen is started - well the one row of tiles along the window!.
Painter: vents on roof painted, eaves done, downpipes done, ceilings done, walls sealed and first coat applied. We are getting him to paint the internal as well for a handsome cash sum.
Plumber: cut the cupboards in preperation for the sink drains. Gas plumber has installed the gas point in the alfresco.
Cabinet maker: reinstalled cupboard next to rangehood - he even replaced the back so that there is no hole from the old water tap point.
Benchtops: bathroom and ensuite benchtops are installed. Waiting for the kitchen Corian (which we signed off as variation 9).
Bathroom with grouting on the wall tiling