Saturday, January 9, 2010

Door fixtures

Hoo rayyy we had someone turn up on Friday. They installed the doors that we removed for the tiling. We have never seen the doors in the laundry or toilets so it is good to see them. Looks finished now. Especially as he also put the door handles on the doors - front door included. He also did the weather seals for the front and garage doors.

We need to check that the deadlock is a single cylinder as he has made some mistakes. The garage door should be a different handle (he has installed an interior door handle). However we are OK with this so will ask the builder not to change it.

The other mistake is that towel rings have been installed in the ensuite and powder rooms when they should have installed hand towel rails. Will do a thorough check tomorrow.