Wednesday, October 7, 2009

Electrical Day 2

The electrician started today installing the wiring. So far there is 5 drums of 100m each so that is 500m of wire!! The chasing guys will need to come back as they did not chase the conduit to the floor for the floor heater in the ensuite and bathroom. They chased only to the roof. Bec also asked them to rechase the pantry light switch (move it to the other side). No problems however he would not add the extra conduits - he said that it would need to be a variation. The chasers need to also recut the box for the garage light switch. Other than that I ran a tape over all the power and light points and they have put it exactly per the dimensioned plan.