Monday, October 26, 2009

Render float - Day 3

Another productive day even though we had a bit of rain. It seemed to rain lightly all day. The guys did the float in beds 2 and 3. Also the bedroom corridor has been done.
Also unusual was that they did the family room wall (opposite the linen cupboard) and also the rear wall for the fridge recess. They must have had some left over and did these small areas.

Hallway
Bed 3
Family room TV wall
Fridge recess
Empty beer cartons

No comments:

Post a Comment