A bit of action on the site today. Drove past at 6:50am and the roof tilers were already on the roof pointing up the ridge tile mortar. It looks much better now which is a relief as I did not really like the rough look when they first applied the mortar bed. They did not take long and then the render guys rocked up. Our SS was also there this morning checking out the linen cupboard and doing his usual round. I know he looked at the linen cupboard as I received an email from our CC later in the morning to confirm that they will be rendering the linen cupboard to the full height. Yay a win for Beccy!
So the render guys almost finished today. They completed the library, entry, study and 2 of the walls in our bedroom. The only drawback was that they rendered over the box containing the data cables!

You can make out the conduit and the white box where they have rendered over the outlet
Pointing installed and looking very tidy now
Rubbish at the bottom of the downpipe due to the rain today
Linen/broom cupboard will be rendered to the top

No comments:

Post a Comment