The plumber was back today. So the list of items completed today
1. Another half load of brickie sand delivered
2. Hot water pipe in kitchen that was punctured is now repaired and rendered over! Hmmm how was it fixed?
3. Bath is installed.
4. Floor waste drain piping completed
5. Roof vents installed
6. Garage wall to slab gap cemented
7. Copper pipes for gas boost HWS re-installed. Water reconnected permanently.
8. Powder room taps and waste drain relocated to suit the shrouded basin that we selected.


Garage wall to slab cement
Roof mushrooms
Bath installed
Chrome floor grille
Floor waste drains
Sewer vent?
Repaired hot water pipe in kitchen (rendered already)
Powder room plumbing relocated