The builder has gone from first gear to third gear this week. Appliances have been delivered and the oven has been installed. The hot plate and rangehood are delivered but still in their box. The sparky has installed most of the faceplates. Some errors are

1. 6 switch faceplate not installed for the dining room
2. Bathroom does not have a separate switch for the vanity downlight

Bec likes the fancy 3 way switch for the front sensor. It has a sensor, off and on position. The data points are also terminated. They did find the one in the study but did make a mess finding it. I wonder when they will ask for the lights that we supply?

Saw our SS at the house today. He was there to check up on a problem with the tile between the pantry and appliance cupboard. I made an executive decision to not have the tile installed. So the SS will just replaster so that we can paint over. So hopefully the tiler was back to finish the tiling in the kitchen.

The fence was also finished by Graham from Jim's Fencing. He did install the post as requested and this looks great. He also finished off the job nicely by capping the posts!

Looking forward to more work tomorrow.

Entry
Library door with handle
Linen cupboards with door handles
Data (x4) and phone point (x2) in the study
Power and TV point
Living room data, power and TV
Kitchen data and power
Bathroom with shower screen and mirror
Ensutie with towel rail
Ensutie shower screen
Oven
Front section of side fence with shade sail pole