Tuesday, February 2, 2010

Finishing Extras

The finishing extras was done today. He spoke to Bec and said that he was our SS's supervisor!! Now he is just contracting. He replaced the chipped bricks on the bathroom window sill. They also levelled the sand around the house. He has also put silicon (or similar) along the top of the bench in the laundry. I couldn't see but he must also have done the ensuite and kitchen also. The locks on the meter boxes were also installed however he left the gas box open in the locked position. The other thing that he did was to replace the paver with the hole in it. This is great however the paving will need to be ripped up so that the conduit for Telstra can be installed. I can't see any other way for the conduit and draw wire to be installed.

The bank today also deposited the surplus into our account. That is very fast considering I only sent the payment paperwork on Monday (yesterday!). I also got a call from the bank's valuer! What the?? He was just checking that all the variations have been completed. So hopefully the builder's payment will be through by the time we have PCI on Thursday.

Other news is that my little princess had her first day at Playfun3 today. Growing up already!! :(





No comments:

Post a Comment