Monday, February 8, 2010

PCI Inspection Closeout

OK so I know I have not updated since PCI last Thursday but it has been busy (the most important being a new iphone!!!) The sparkie came and replaced the power points in the garage right after PCI. Hmmm we never got a copy of the PCI list from the construction manager. Anyway we had the timber flooring delivered on Friday and the remainder of the patio delivered on the Thursday afternoon.

The patio company came and started the patio on Friday and got part of the main section up and 3 poles installed. He was doing it mostly by himself so it will take a while (about 7 days he said so maybe by the end of next week it will be done.

The flooring was also delivered by one person. It was not even a big truck with a HIAB but a young block with a ute!! He had to cut the packs open and bring the timbers into the house individually! It was four loads and the later loads were the ute and a trailer. As the trailer was a tandem axel trailer, it left tyre marks when he reversed in the driveway but that will come out.

The roof tiles came back today to finish off the roof. They replaced cracked, chipped tiles and painted the edges of the tiles in the valleys and other minor chipped areas. The roof really looks good now.

I called the bank today to see when our payment to the builder would go through and found that they were helpful but it was like pushing a wheelbarrow up a hill.

Now we are justing waiting for the bank to pay and get the keys.