Monday, September 14, 2009

Bricking Day 5

After 2 days rest (the weekend), more bricking was completed today. All internal perimeter walls are at plate height. A lot of the internal walls are also complete. Looks like they are leaving the front foyer wall until last so that they can have access. Ohh also no power connection today, maybe tomorrow.
Kitchen and Library
Kitchen

Dining

Toy room
Bed 5 from the family room
Bathroom (linen yet to be done in front)
Bed 2 and 3 with WIR in between
Bed 2 and Ensuite
Study and Main Bed
Foyer