Saturday, January 23, 2010

Paving Preparation

The bobcat came to prepare the driveway and path area ready for paving next week. There is no sign of the plumber who needs to connect the gas as it runs under the paving. Also the telstra line runs under the paving so I emailed the builder about it but got no response. Hope they do it in Monday when the concreters are there and before Wednesday when they will lay the paving.
The painter came back and painted the gas piping to the meter, the meter boxes and the conduit in the garage. He will still need to come back for the HWS.