Painting was completed internally today. They will only need to do the eter boxes and HWS piping once that is installed.
The soakwells were also connected today., The have connected 5 to the front and 5 to the back as predicted. It looks like they have also installed the separate soakwell for the garage drain grate as required. Not sure if they installed a concrete or plastic one though. It was also good to see the flash grates that they installed rather than close coupling the downpipes.