Thursday, January 21, 2010

Painting done, Soakwells connected

Painting was completed internally today. They will only need to do the eter boxes and HWS piping once that is installed.

The soakwells were also connected today., The have connected 5 to the front and 5 to the back as predicted. It looks like they have also installed the separate soakwell for the garage drain grate as required. Not sure if they installed a concrete or plastic one though. It was also good to see the flash grates that they installed rather than close coupling the downpipes.